⚡ POWERtrac Group Successfully Commissions 5MVA, 33kV Substation for Polypack Woven Industries ⚡ POWERtrac Group and Kalpa Electrical Pvt. Ltd. Enter Strategic Distribution and Technology Partnership ⚡ Highlights from the 3rd PSC Expo & Seminar! ⚡ Celebrating the Appointment of Executive Engineer Majadur Rahman Tara! ⚡ স্বনামধন্য কনসালট্যান্টের সঙ্গে সৌজন্য সাক্ষাৎ ⚡ First Work Order of 2025: BBT Project for Ziska Pharmaceutical ⚡ Successful technical seminar with engineers from 12 districts across Bangladesh, under the Khulna Division of the Public Works Department (PWD). ⚡ PROMOTED: Engr. Joy Aditya, the factory head of POWERtrac Group has recently been promoted as DGM. ⚡ We have successfully handed over 1. Compact Sub-Station(X2) 2. 1250 KVA, 33/0.415 KV Sub-Station(X2)... ⚡ We have successfully handed Over Tr-1,Tr-2 Dry Type Transformer Varendra University, Rajshahi ⚡ POWERtrac has successfully completed the Design, Supply, Installation, and Commissioning of 100 KWp .... ⚡ We have successfully handed over 5.5 MVA 33kv and 3.5 MVA, 11kv Substation at ICCL. ⚡ POWERtrac Group Successfully Commissions 5MVA, 33kV Substation for Polypack Woven Industries ⚡ POWERtrac Group and Kalpa Electrical Pvt. Ltd. Enter Strategic Distribution and Technology Partnership ⚡ Highlights from the 3rd PSC Expo & Seminar! ⚡ Celebrating the Appointment of Executive Engineer Majadur Rahman Tara! ⚡ স্বনামধন্য কনসালট্যান্টের সঙ্গে সৌজন্য সাক্ষাৎ ⚡ First Work Order of 2025: BBT Project for Ziska Pharmaceutical ⚡ Successful technical seminar with engineers from 12 districts across Bangladesh, under the Khulna Division of the Public Works Department (PWD). ⚡ PROMOTED: Engr. Joy Aditya, the factory head of POWERtrac Group has recently been promoted as DGM. ⚡ We have successfully handed over 1. Compact Sub-Station(X2) 2. 1250 KVA, 33/0.415 KV Sub-Station(X2)... ⚡ We have successfully handed Over Tr-1,Tr-2 Dry Type Transformer Varendra University, Rajshahi ⚡ POWERtrac has successfully completed the Design, Supply, Installation, and Commissioning of 100 KWp .... ⚡ We have successfully handed over 5.5 MVA 33kv and 3.5 MVA, 11kv Substation at ICCL.

33 kV Metering & 11/0.415 kV Substation Project

Project Scope & Works Executed

  • Supply and installation of 33 kV Metering Part for utility-grade energy measurement
  • Design and installation of 11/0.415 kV Substation System
  • Supply and installation of Power Transformer for low-voltage distribution
  • Integration of HT metering components in compliance with utility requirements
  • Supply and installation of LT distribution system for operational loads
  • Installation of ELB (Earth Leakage Breaker) for personnel and equipment safety
  • System testing, commissioning, and final handover

Project Summary

POWERtrac successfully delivered a reliable high-voltage metering and low-voltage substation solution for Lira Group, ensuring accurate energy measurement and stable power distribution for industrial operations. The project combined 33 kV metering infrastructure with a robust 11/0.415 kV substation, enabling compliance with utility standards while ensuring operational safety and efficiency. With proper protection through ELB and professionally executed installation and commissioning, the system provides dependable power supply, enhanced electrical safety, and long-term operational reliability.