⚡ POWERtrac at SAFECON 2026 — A 3-Day Showcase of Innovation in Power & Electrical Engineering Solutions Bangladesh ⚡ Q-Center & Q-Hotel (Quality Feeds Ltd.) — 2×2000 kVA Substation & BBT System Successfully Commissioned by POWERtrac | Dhaka ⚡ Bandhon City Development — 500 kVA Substation Successfully Commissioned by POWERtrac | Urban Power Infrastructure Bangladesh ⚡ Bashundhara Golf Driving Range Stadium Gets 1600 KVA Substation & 2500A BBT Power System | POWERtrac Project Update ⚡ Polypack Woven Industries — 5MVA, 33kV Industrial Substation Successfully Commissioned by POWERtrac ⚡ POWERtrac Group & Kalpa Electrical Pvt. Ltd. — Strategic Distribution & Technology Partnership MoU Signed ⚡ 3rd International PSC Expo & Seminar — POWERtrac Showcases Smart & Sustainable Electrical Solutions ⚡ Ziska Pharmaceutical — POWERtrac Secures First Work Order of 2025 with BBT Project ⚡ Successful technical seminar with engineers from 12 districts across Bangladesh, under the Khulna Division of the Public Works Department (PWD). ⚡ PROMOTED: Engr. Joy Aditya, the factory head of POWERtrac Group has recently been promoted as DGM. ⚡ We have successfully handed over 1. Compact Sub-Station(X2) 2. 1250 KVA, 33/0.415 KV Sub-Station(X2)... ⚡ We have successfully handed Over Tr-1,Tr-2 Dry Type Transformer Varendra University, Rajshahi ⚡ POWERtrac has successfully completed the Design, Supply, Installation, and Commissioning of 100 KWp .... ⚡ We have successfully handed over 5.5 MVA 33kv and 3.5 MVA, 11kv Substation at ICCL. ⚡ POWERtrac at SAFECON 2026 — A 3-Day Showcase of Innovation in Power & Electrical Engineering Solutions Bangladesh ⚡ Q-Center & Q-Hotel (Quality Feeds Ltd.) — 2×2000 kVA Substation & BBT System Successfully Commissioned by POWERtrac | Dhaka ⚡ Bandhon City Development — 500 kVA Substation Successfully Commissioned by POWERtrac | Urban Power Infrastructure Bangladesh ⚡ Bashundhara Golf Driving Range Stadium Gets 1600 KVA Substation & 2500A BBT Power System | POWERtrac Project Update ⚡ Polypack Woven Industries — 5MVA, 33kV Industrial Substation Successfully Commissioned by POWERtrac ⚡ POWERtrac Group & Kalpa Electrical Pvt. Ltd. — Strategic Distribution & Technology Partnership MoU Signed ⚡ 3rd International PSC Expo & Seminar — POWERtrac Showcases Smart & Sustainable Electrical Solutions ⚡ Ziska Pharmaceutical — POWERtrac Secures First Work Order of 2025 with BBT Project ⚡ Successful technical seminar with engineers from 12 districts across Bangladesh, under the Khulna Division of the Public Works Department (PWD). ⚡ PROMOTED: Engr. Joy Aditya, the factory head of POWERtrac Group has recently been promoted as DGM. ⚡ We have successfully handed over 1. Compact Sub-Station(X2) 2. 1250 KVA, 33/0.415 KV Sub-Station(X2)... ⚡ We have successfully handed Over Tr-1,Tr-2 Dry Type Transformer Varendra University, Rajshahi ⚡ POWERtrac has successfully completed the Design, Supply, Installation, and Commissioning of 100 KWp .... ⚡ We have successfully handed over 5.5 MVA 33kv and 3.5 MVA, 11kv Substation at ICCL.

Garments Industry Electrical Power System Project

Project Scope & Works Executed

  • Supply and installation of HT Switchgear (VCB) for primary power control and protection
  • Supply and installation of HT Switchgear (ACB) for reliable switching and isolation
  • Installation of LT Switchgear – 2000A for main low-voltage power distribution
  • Installation of 2000A LT Switchgear (Generator Control Panel) for seamless DG power integration
  • Installation of Automatic PFI Plant – 2400 kVAr to improve power factor and reduce energy losses
  • Installation of ELB (Earth Leakage Breaker) for enhanced personnel and equipment safety
  • Complete installation, testing, commissioning, and operational handover

Project Summary

POWERtrac successfully executed a comprehensive electrical power distribution project for Unicorn Sweater Limited, ensuring reliable and efficient power supply for continuous garment manufacturing operations. The project integrated advanced HT switchgear (VCB & ACB), high-capacity LT distribution and generator control panels, and a large 2400 kVAr automatic PFI plant to optimize power quality and energy efficiency. With added safety through ELB protection and robust system integration, the installation delivers stable operation, reduced electrical losses, and dependable backup power readiness—supporting uninterrupted production and long-term operational reliability.