Latest News
⚡ POWERtrac Group Successfully Commissions 5MVA, 33kV Substation for Polypack Woven Industries ⚡ POWERtrac Group and Kalpa Electrical Pvt. Ltd. Enter Strategic Distribution and Technology Partnership ⚡ Highlights from the 3rd PSC Expo & Seminar! ⚡ Celebrating the Appointment of Executive Engineer Majadur Rahman Tara! ⚡ স্বনামধন্য কনসালট্যান্টের সঙ্গে সৌজন্য সাক্ষাৎ ⚡ First Work Order of 2025: BBT Project for Ziska Pharmaceutical ⚡ Successful technical seminar with engineers from 12 districts across Bangladesh, under the Khulna Division of the Public Works Department (PWD). ⚡ PROMOTED: Engr. Joy Aditya, the factory head of POWERtrac Group has recently been promoted as DGM. ⚡ We have successfully handed over 1. Compact Sub-Station(X2) 2. 1250 KVA, 33/0.415 KV Sub-Station(X2)... ⚡ We have successfully handed Over Tr-1,Tr-2 Dry Type Transformer Varendra University, Rajshahi ⚡ POWERtrac has successfully completed the Design, Supply, Installation, and Commissioning of 100 KWp .... ⚡ We have successfully handed over 5.5 MVA 33kv and 3.5 MVA, 11kv Substation at ICCL. ⚡ POWERtrac Group Successfully Commissions 5MVA, 33kV Substation for Polypack Woven Industries ⚡ POWERtrac Group and Kalpa Electrical Pvt. Ltd. Enter Strategic Distribution and Technology Partnership ⚡ Highlights from the 3rd PSC Expo & Seminar! ⚡ Celebrating the Appointment of Executive Engineer Majadur Rahman Tara! ⚡ স্বনামধন্য কনসালট্যান্টের সঙ্গে সৌজন্য সাক্ষাৎ ⚡ First Work Order of 2025: BBT Project for Ziska Pharmaceutical ⚡ Successful technical seminar with engineers from 12 districts across Bangladesh, under the Khulna Division of the Public Works Department (PWD). ⚡ PROMOTED: Engr. Joy Aditya, the factory head of POWERtrac Group has recently been promoted as DGM. ⚡ We have successfully handed over 1. Compact Sub-Station(X2) 2. 1250 KVA, 33/0.415 KV Sub-Station(X2)... ⚡ We have successfully handed Over Tr-1,Tr-2 Dry Type Transformer Varendra University, Rajshahi ⚡ POWERtrac has successfully completed the Design, Supply, Installation, and Commissioning of 100 KWp .... ⚡ We have successfully handed over 5.5 MVA 33kv and 3.5 MVA, 11kv Substation at ICCL.

2000 kVA Substation, Transformer Servicing & Solar Power Project

Project Scope & Works Executed

  • Design, supply, and installation of 2000 kVA, 11/0.415 kV Oil-Type Power Transformer with OLTC
  • Execution of 2000 kVA Substation complete with HT & LT systems
  • Transformer Oil Centrifuging for 500 kVA and 630 kVA transformers
  • Transformer Oil Testing from CERS for 500 kVA & 630 kVA units
  • Installation of Dropout Fuse System for transformer protection
  • Installation of Lightning Arresters for surge and over-voltage protection
  • Supply and installation of 11 kV HT Switchgear (VCB) – 630A
  • Installation of LT Switchgear – 3200A with ATS (Automatic Transfer Switch)
  • Installation of Automatic Power Factor Improvement (PFI) Plant – 1200 kVAR
  • Complete Earthing System installation for electrical safety and compliance
  • Installation of 11 kV Heat Shrink Cable Jointing Kits
  • Supply and installation of Cable Ladder System for organized cable routing
  • Installation of Metering CT & PT with Testing and Calibration
  • Design and installation of 100 kW Solar Power System
  • System testing, commissioning, and final handover

Project Summary

POWERtrac successfully executed a comprehensive electrical power, transformer servicing, and renewable energy project for Bettex Industries Ltd., delivering a robust and future-ready power infrastructure. The project combined a 2000 kVA OLTC-based substation, advanced HT and LT switchgear, transformer oil centrifuging and certified oil testing, automatic power factor correction, and a 100 kW solar power system to enhance both reliability and energy efficiency. Special emphasis was placed on electrical safety through proper earthing, surge protection, metering accuracy, and ATS-integrated LT systems. This integrated solution ensures stable power supply, improved power quality, reduced operational losses, and sustainable energy utilization for uninterrupted industrial operations.