⚡ POWERtrac at SAFECON 2026 — A 3-Day Showcase of Innovation in Power & Electrical Engineering Solutions Bangladesh ⚡ Q-Center & Q-Hotel (Quality Feeds Ltd.) — 2×2000 kVA Substation & BBT System Successfully Commissioned by POWERtrac | Dhaka ⚡ Bandhon City Development — 500 kVA Substation Successfully Commissioned by POWERtrac | Urban Power Infrastructure Bangladesh ⚡ Bashundhara Golf Driving Range Stadium Gets 1600 KVA Substation & 2500A BBT Power System | POWERtrac Project Update ⚡ Polypack Woven Industries — 5MVA, 33kV Industrial Substation Successfully Commissioned by POWERtrac ⚡ POWERtrac Group & Kalpa Electrical Pvt. Ltd. — Strategic Distribution & Technology Partnership MoU Signed ⚡ 3rd International PSC Expo & Seminar — POWERtrac Showcases Smart & Sustainable Electrical Solutions ⚡ Ziska Pharmaceutical — POWERtrac Secures First Work Order of 2025 with BBT Project ⚡ Successful technical seminar with engineers from 12 districts across Bangladesh, under the Khulna Division of the Public Works Department (PWD). ⚡ PROMOTED: Engr. Joy Aditya, the factory head of POWERtrac Group has recently been promoted as DGM. ⚡ We have successfully handed over 1. Compact Sub-Station(X2) 2. 1250 KVA, 33/0.415 KV Sub-Station(X2)... ⚡ We have successfully handed Over Tr-1,Tr-2 Dry Type Transformer Varendra University, Rajshahi ⚡ POWERtrac has successfully completed the Design, Supply, Installation, and Commissioning of 100 KWp .... ⚡ We have successfully handed over 5.5 MVA 33kv and 3.5 MVA, 11kv Substation at ICCL. ⚡ POWERtrac at SAFECON 2026 — A 3-Day Showcase of Innovation in Power & Electrical Engineering Solutions Bangladesh ⚡ Q-Center & Q-Hotel (Quality Feeds Ltd.) — 2×2000 kVA Substation & BBT System Successfully Commissioned by POWERtrac | Dhaka ⚡ Bandhon City Development — 500 kVA Substation Successfully Commissioned by POWERtrac | Urban Power Infrastructure Bangladesh ⚡ Bashundhara Golf Driving Range Stadium Gets 1600 KVA Substation & 2500A BBT Power System | POWERtrac Project Update ⚡ Polypack Woven Industries — 5MVA, 33kV Industrial Substation Successfully Commissioned by POWERtrac ⚡ POWERtrac Group & Kalpa Electrical Pvt. Ltd. — Strategic Distribution & Technology Partnership MoU Signed ⚡ 3rd International PSC Expo & Seminar — POWERtrac Showcases Smart & Sustainable Electrical Solutions ⚡ Ziska Pharmaceutical — POWERtrac Secures First Work Order of 2025 with BBT Project ⚡ Successful technical seminar with engineers from 12 districts across Bangladesh, under the Khulna Division of the Public Works Department (PWD). ⚡ PROMOTED: Engr. Joy Aditya, the factory head of POWERtrac Group has recently been promoted as DGM. ⚡ We have successfully handed over 1. Compact Sub-Station(X2) 2. 1250 KVA, 33/0.415 KV Sub-Station(X2)... ⚡ We have successfully handed Over Tr-1,Tr-2 Dry Type Transformer Varendra University, Rajshahi ⚡ POWERtrac has successfully completed the Design, Supply, Installation, and Commissioning of 100 KWp .... ⚡ We have successfully handed over 5.5 MVA 33kv and 3.5 MVA, 11kv Substation at ICCL.

Integrated Power & Solar Energy Project

Project Scope & Works Executed

  • Design and implementation of 33/11 kV Substation
  • Installation of 11/0.415 kV Distribution Substation
  • Supply and installation of ELB (Earth Leakage Breaker) for enhanced electrical safety
  • Execution of Load Sanction & HT Metering Works in coordination with utility authority
  • Installation of BBT (Bus Bar Trunking) System for efficient power distribution
  • Complete Civil Works related to substation foundation and equipment installation
  • Design and installation of 40 kW Solar On-Grid System
  • System integration, testing, commissioning, and final handover

Project Summary

POWERtrac successfully delivered a comprehensive power infrastructure and renewable energy solution for Blossom Spinning, combining high-voltage and low-voltage substations with a solar on-grid system. The project was designed to ensure reliable power supply for continuous textile manufacturing while improving electrical safety, compliance, and energy efficiency. By integrating utility load sanctioning, HT metering, structured power distribution through BBT, and a 40 kW solar on-grid system, the installation reduces operational costs and supports sustainable energy usage. This end-to-end solution enhances production reliability, ensures regulatory compliance, and prepares the facility for future expansion.