⚡ Highlights from the 3rd PSC Expo & Seminar! ⚡ Celebrating the Appointment of Executive Engineer Majadur Rahman Tara! ⚡ স্বনামধন্য কনসালট্যান্টের সঙ্গে সৌজন্য সাক্ষাৎ ⚡ First Work Order of 2025: BBT Project for Ziska Pharmaceutical ⚡ Successful technical seminar with engineers from 12 districts across Bangladesh, under the Khulna Division of the Public Works Department (PWD). ⚡ PROMOTED: Engr. Joy Aditya, the factory head of POWERtrac Group has recently been promoted as DGM. ⚡ We have successfully handed over 1. Compact Sub-Station(X2) 2. 1250 KVA, 33/0.415 KV Sub-Station(X2)... ⚡ We have successfully handed Over Tr-1,Tr-2 Dry Type Transformer Varendra University, Rajshahi ⚡ POWERtrac has successfully completed the Design, Supply, Installation, and Commissioning of 100 KWp .... ⚡ We have successfully handed over 5.5 MVA 33kv and 3.5 MVA, 11kv Substation at ICCL. ⚡ Highlights from the 3rd PSC Expo & Seminar! ⚡ Celebrating the Appointment of Executive Engineer Majadur Rahman Tara! ⚡ স্বনামধন্য কনসালট্যান্টের সঙ্গে সৌজন্য সাক্ষাৎ ⚡ First Work Order of 2025: BBT Project for Ziska Pharmaceutical ⚡ Successful technical seminar with engineers from 12 districts across Bangladesh, under the Khulna Division of the Public Works Department (PWD). ⚡ PROMOTED: Engr. Joy Aditya, the factory head of POWERtrac Group has recently been promoted as DGM. ⚡ We have successfully handed over 1. Compact Sub-Station(X2) 2. 1250 KVA, 33/0.415 KV Sub-Station(X2)... ⚡ We have successfully handed Over Tr-1,Tr-2 Dry Type Transformer Varendra University, Rajshahi ⚡ POWERtrac has successfully completed the Design, Supply, Installation, and Commissioning of 100 KWp .... ⚡ We have successfully handed over 5.5 MVA 33kv and 3.5 MVA, 11kv Substation at ICCL.

Design and Engineering:

The manufacturing process of electrical panels begins with careful design and engineering. Designers analyze the specific requirements of the project, considering factors such as power capacity, voltage levels, and the nature of electrical loads. They utilize computer-aided design (CAD) software to create detailed layouts and schematics, ensuring optimal performance and safety.

Component Selection and Procurement:

Once the design is finalized, manufacturers procure the necessary components to assemble the electrical panels. These components may include circuit breakers, transformers, fuses, busbars, relays, and various other electrical devices. It is crucial to source high-quality components from reliable suppliers to ensure the durability and reliability of the end product.

Panel Fabrication and Assembly:

The fabrication and assembly process involves constructing the physical structure of the panel and integrating the electrical components. Manufacturers use sheets of high-quality metal, such as steel or aluminum, to build the enclosure, ensuring durability and protection against external elements. Skilled technicians mount the components onto the back panel, organize wiring, and connect everything according to the electrical schematics created during the design phase.

Testing and Quality Assurance:

Before the electrical panels are deemed fit for installation, rigorous testing and quality assurance processes are undertaken. These procedures involve running the panels through simulated scenarios to evaluate their performance, safety features, and adherence to industry standards. This ensures that the panels can handle the designated power loads, operate within specified voltage limits, and protect against faults or short circuits.

Compliance with Safety Standards:

Manufacturing electrical panels necessitates strict compliance with safety codes and regulations. Panels must meet various standards set by organizations such as the National Electrical Manufacturers Association (NEMA) or the International Electrotechnical Commission (IEC). Adherence to these standards ensures that the panels are built to withstand potential hazards, support safe operation, and provide adequate electrical protection.